资讯
In Ahmedabad, the metro network will be further extended to link key locations like the airport and GIFT City — a rapidly growing financial and tech hub. The first phase of this expansion is expected ...
Bengaluru, India (Metro Rail Today): More than a decade after Bengaluru launched its first metro line, the city’s much-hyped Phase 2 expansion remains a work in progress—with major sections now ...
Prime Narendra Modi has cancelled the programme scheduled in Kanpur on April 24 in the wake of Pahalgam terror attack, which claimed 26 lives. The Prime Minister was ...
Ahmedabad: The maximum temperature on Tuesday in the city reached 41.9°C, which was 1.7 degrees higher than normal. At 23.9°C, the minimum temperature was 1.2 degrees higher than normal.
2025 With Phase -1 of Metro 3 already operational, MMRC is now gearing up for Phase 2! Phase 2 (BKC to Cuffe Parade) has achieved 93% progress, while the overall project stands at 95%. Stay tuned ...
for Corridor- 4 Chennai Metro Rail Project Phase II. The bids submitted by the 4 firms have been sent for technical evaluation. After the technical evaluation, the financial bids of the technically ...
Now, all of this is just a metro ride away. The route of Metro 3 Phase 2a spans 18.6 km, starting from Dahisar and connecting to D N Nagar. This elevated corridor has 17 stations along the way.
The project cost for Metro's Phase 1 (42 km) rose from an estimated Rs 6,395 crore in 2005 to Rs 14,133 crore, while the cost for Phase 2 (72 km) increased from Rs 26,405 crore in 2014 to Rs ...
In order to accommodate the growing commuter demand, the last train departure from all Hyderabad Metro Rail terminal stations will be extended from 11 pm to 11.45 pm (Monday to Friday) from April 1 ...
一些您可能无法访问的结果已被隐去。
显示无法访问的结果