资讯

WSDOT said it is “getting a game plan” to repair the culvert, but there is no estimated time for reopening. The agency said the failure wasn’t due to deferred proactive maintenance.
The highway will be closed at that location for about two months. The work will replace the existing culvert pipes at Logan Creek with a new at-grade slab span bridge. It's the third of four ...
Greece Deputy Town Supervisor Kirk Morris said deterioration of a storm water culvert pipe under Denise Road at Ripplewood Drive caused the sinkhole to form. After inspection, it was determined ...