资讯

Ahmedabad: Now, your trip to the Sachivalaya in Gandhinagar need not involve highways or traffic jams. Instead, just hop on ...
According to The Metro Rail Guy report, the proposed MHHSR corridor will span 767 km, connecting three major urban hubs ...
As per National High-Speed Rail Corporation Ltd (NHSRCL) officials, groundwork at the Mumbai station is now 75% complete, ...
Progress update on Mumbai bullet train station excavation, platform details, tunnel construction, and viaduct completion by ...
Western Railway said Train No 12903 Mumbai Central–Amritsar Golden Temple Express will arrive/depart Vadodara station at ...
Gurugram leads Delhi-NCR with a 58% property price surge along the Dwarka Expressway, driven by infrastructure and demand for ...
The Western Railway has changed the timings of a few trains from Sunday, April 20. The details of the revised train timings ...
Top on the list is the Phase-2 of the Chennai Metro that could see the metro corridor in Chennai expand by 119 kilometres. Three new regional rail transit systems (RRTS) for the state, from Coimbatore ...
The 19.15-km metro corridor connecting RV Road with Bommasandra via Silk Board Junction has long been ready, but commercial operations haven't begun due to lack of trainsets.
Pune: The trains will not run on the under-construction elevated Metro corridor between Shivajinagar and Hinjewadi before 2026. The PMRDA's Metro Line 3, connecting Shivajinagar and Hinjewadi ...
The Mumbai-Ahmedabad Bullet Train project achieved another key milestone with the successful launch of a 70-metre-long steel bridge over the Dedicated Freight Corridor Corporation of India Limited ...